| Earth Orbit / TransLunar Trajectory | LM Ascent & Rendezvous | |||
| Booster Shutdown (LEO) | 12 min | LM Ascent Initiation | 188 hr 03 min | |
| Trans Lunar Injection Burn | 3 hr 21 min | Burn Duration = 438 sec | ||
| TLI Burn Duration = 346 sec | CSM 2nd Pass Over Site | 188 hr 04 min | ||
| CSM/S-IVB Separation | 4 hr 12 min | LM Orbit Insertion | 188 hr 11 min | |
| Dock with LM | 4 hr 22 min | Terminal Phase Init. | 188 hr 58 min | |
| CSM/LM ejection | 5 hr 07 min | Burn Duration = 3 sec | ||
| S-IVB Evasive Maneuver | 5 hr 30 min | Rendezvous Maneuvers | ||
| Midcourse Correction 1 | 8 hr 45 min | Braking | 189 hr 39 min | |
| MCC - 2 | 35 hr 30 min | Docking | 190 hr 00 min | |
| MCC - 3 | 66 hr 55 min | LM Jettison | 193 hr 59 min | |
| MCC - 4 | 83 hr 55 min | CSM Separation Burn | 194 hr 04 min | |
| Lunar Orbit Insertion | 8 hr 56 min | Burn Duration = 13 sec | ||
| LOI Burn Duration = 395 sec | LM Ascent Stage Deorbit | 195 hr 39 min | ||
| LM Ascent Stage Impact | 195 hr 58 min | |||
| Lunar Orbit /Descent/Landing/Surface | Return to Earth | |||
| Descent Orbit Insertion | 93 hr 12 min | TransEarth Injection | 236 hr 40 min | |
| DOI Burn Duration = 23 sec | Burn Duration = 142 sec | |||
| LM/CSM Separation | 110 hr 28 min | MCC - 5 | 253 hr 42 min | |
| CSM Circularization | 111 hr 55 min | MCC - 6 | 282 hr 18 min | |
| Circ. Burn Duration = 4 sec | MCC - 7 | 301 hr 18 min | ||
| LM Descent Orbit Insert. | 112 hr 01 min | CM/SM Separation | 304 hr 03 min | |
| LM DOI Burn duration = 27 sec | Entry Interface | 304 hr 18 min | ||
| Powered Descent Init. | 112 hr 50 min | CM Landing | 304 hr 31 min | |
| CSM First Pass Over Site | 112 hr 57 min | TYPICAL APOLLO BURNS | ||
| LM High Gate | 112 hr 59 min | Boost to Orbit | 31,000 fps | |
| LM Low Gate | 113 hr 00 min | (With drag & gravity losses) | ||
| LM Vertical Descent | 113 hr 01 min | Speed in earth orbit | (25,570 fps) | |
| LM Landing | 113 hr 02 min | TransLunar Injection | 10,000-10,600 fps | |
| First EVA | 116 hr 40 min | Midcourse Corrections | 150 fps | |
| (7 hr duration) | Lunar Orbit Insertion | 3,000-3,500 fps | ||
| Second EVA | 139 hr 10 min | Speed in Lunar Orbit | (5348 fps) | |
| (7 hr duration) | Descent Orbit Insert. Burn | 140 fps | ||
| Third EVA | 162 hr 40 min | Powered Descent/Land | 6900 fps | |
| (7 hr duration) | Lunar Surface Operations | |||
| CSM Plane Change Burn | 182 hr 36 min | Lunar Launch to Orbit | 6,100 fps | |
| Burn Duration = 19 sec | TransEarth Injection | 3,500 fps | ||
| Midcourse Corrections | 150 fps | |||
| Entry velocity | (36,000-36,300 fps) | |||

Saturday, 28-Aug-1999 13:15:59 CDT
CSR/TSGC Team Web