Meeting Minutes, 11/06/95: Tuesday - Rebecca Martin

Revised mass, power, and thermal requirements:
Power - John: same as last week
NGC - Ken: same as last week
Thermal - Greg and Rebecca: 45 kg, 45 W
Public Relations - Kristin: 6 g
Structure - Ronny: 70.8 kg
Propulsion - Ken: 500 kg
Communications - Greg: 22.1 kg, 44
Progress Reports: Only a handful of progress reports were submitted the previous week. Extreme disappointment was shown by each member of the group.

Fall Conference: The date was narrowed down to either Friday December 1 or Saturday December 2. It was determined that if the conference were held on December 1, Prairie View A&M University would not be able to participate. As a result, everyone was going to speak with their school and determine if they could not attend on either of the two above mentioned days. A final decision will be made on Thursday.

Final Presentation: Each group will have 15 minutes to speak and 5 minutes of question and answer time. After the presentations, time will be allotted for brainstorming sessions with the students and the professors. Following these sessions, University of Houston, Downtown will give a tour of their facilities. For the presentation, formal business presentation attire is required.

Final Paper Guidelines: Kristin provided the group with a guidelines for the final paper. Revisions were made to the guidelines by the system integration group. Each subsystem group will be given these guidelines once the revisions are made.

T-shirts: Kristin is looking into getting T-shirts made now that money miraculously appeared. Look for order forms that will be sent to you shortly.

Engineering Meeting

Meeting adjourned